Bank Draw Verification
A comprehensive, compliance-ready financial draw report featuring site progress data, inspector notes, and standard 5-photo grid layout per page.
Turnaround: Available same-day as inspection
View ReportOrthomosaic Mapping
A high-resolution, top-down composite map generated from hundreds of individual drone captures for precise site measurement and planning.
Turnaround: Available the day after inspection
View Map (31MB)3D Site Digital Twin
An interactive, navigable 3D model of a commercial site, processed for web viewing. Used for spatial analysis, volume measurement, and remote walkthroughs.
Turnaround: Available the day after inspection
View 3D Interactive MapService Area & Deployment Speeds
Search for an address to see our estimated deployment speed for your location.
Priority Zone
Deployment: Typically same-day if requested before noon.
Deliverables: Data finalized same day as inspection.
Standard Zone
Deployment: Typically next-day.
Deliverables: Data finalized same day as inspection.
Extended Zone
Deployment: Next-day or up to 48 hours.
Deliverables: Finalized within 48 hours of deployment.
The Reliability Commitment: Weather Contingency
Construction funding doesn't stop for the weather. To ensure draw reports are delivered on schedule, we offer a direct choice between speed and data depth during inclement conditions (25mph+ winds, rain, or fog):
- Immediate Ground Transition (Priority: Speed): For urgent deadlines, we shift to a comprehensive ground-only inspection. This protocol ensures delivery on schedule by substituting aerial context for immediate verification.
- Window Monitoring (Priority: Full Data): We monitor localized weather windows to complete the full aerial and ground capture as soon as conditions safely allow within the same business day.
- Priority Rescheduling: Should a ground-only transition not be requested, the project is automatically elevated to a Priority One Deployment for the next available weather window.